hri remediates pond at chemical manufacturing facility

SCOPE

A chemical manufacturing facility was closing a pond on their property, and the pond required remediation before it was filled in. They needed a contractor with the expertise and heavy equipment to clean and restore the site.

solution

Hulcher Resources was selected to perform this project through a competitive bidding process, and deployed a dozer, excavator, backhoe and compactor to complete the work.


Hulcher’s crews stabilized the pond bottom using fly ash and cement kiln dust to bind the matrix, placed and regraded the site fill material and brought in sand and clay to fill the pond.


Part of the project included the construction and installation of a treatment amendment delivery system to inject treatment chemicals into the bottom of the cell. Hulcher also managed the reconstruction of a drainage sewer and outfall.



Hulcher completed the project by placing topsoil and seeding the area for grass.


  • Slide title

    Before

    Button
  • Slide title

    After

    Button

SCOPE

A chemical manufacturing facility was closing a pond on their property, and the pond required remediation before it was filled in. They needed a contractor with the expertise and heavy equipment to clean and restore the site.

solution

Hulcher Resources was selected to perform this project through a competitive bidding process, and deployed a dozer, excavator, backhoe and compactor to complete the work.


Hulcher’s crews stabilized the pond bottom using fly ash and cement kiln dust to bind the matrix, placed and regraded the site fill material and brought in sand and clay to fill the pond.

  • Slide title

    Before

    Button
  • Slide title

    After

    Button

Part of the project included the construction and installation of a treatment amendment delivery system to inject treatment chemicals into the bottom of the cell. Hulcher also managed the reconstruction of a drainage sewer and outfall.



Hulcher completed the project by placing topsoil and seeding the area for grass.

outcome

Over a two-month period Hulcher transformed a closed pond that was an eyesore into an attractive, open space that added visual appeal to the property. Hulcher’s environmental professionals led this project from start to finish, and their expertise resulted in a properly remediated space with all the necessary drainage to keep it functional and aesthetically pleasing for years to come.


* Analysis, containment, treatment, transport, and disposal of material are each conducted in full compliance with relevant federal and applicable state laws/regulations (licensing, permitting, procedural and operational protocol) which sometimes requires the participation of fellow contractors engaged by the customer and/or Hulcher subcontractors.